Bathroom renovation
Old tile out, new tile in, laid flat and level. Vanities, mirrors and fixtures set straight and sealed properly. Most of our bathroom jobs are in Gulf Harbour, Fort Myers and Cape Coral.

A bathroom shows every shortcut: lippage between tiles, a niche that isn’t centered, grout lines that drift. We plan the tile layout before the first piece goes down, waterproof the shower properly, and take the time to get the details right.
Several of our clients called us to redo work another company left unfinished. We’re happy to take a look at yours.
What’s included
- Tear-out and prep
- Old tile, tub surrounds and vanities removed, walls and floors prepared and leveled for the new finish.
- Showers
- Waterproofed tile showers, large-format porcelain walls, niches and benches, shower floors sloped to the drain.
- Vanities, mirrors and fixtures
- Single and double vanities, backlit and framed mirrors, faucets, shower trim and accessories installed level and sealed.
- Floors and finish
- Floor tile, baseboards, paint and caulk lines kept clean and straight.
Before and after
A tub-and-wallpaper bathroom turned into a walk-in shower in large-format porcelain, keeping the owner’s stained-glass window.


From our clients
“We originally called Oleh to come take a look and completely redo what another contractor previously did with us. After Oleh’s professionalism and expertise, what was once a nightmare was turned into beauty! … Our bathroom is looking absolutely beautiful, thank you once again Oleh. The job was just magnificent.”
“I ordered a bathroom renovation from Euro Home Improvement. They removed the old tiles, laid new ones, installed a shower cabin, washbasin, mirror with backlight, updated the plumbing. The work was done neatly, without unnecessary chaos, and most importantly, on time.”
“I recently needed some home repair services for my kitchen and bathroom and I gotta say I’m super impressed. They responded so quick and gave me a clear idea of what to expect. The quality of their work was really good, they got everything done with a lot of detail and precision.”
Questions about bathroom renovation
How long does a bathroom renovation take?
A typical full bathroom takes about one to three weeks on site, depending on size, tile and how long materials take to arrive. You’ll get a schedule with the written quote.
Can you fix a bathroom another company left unfinished?
Often, yes. We’ll come out, look at what was done, and tell you plainly what can be saved and what has to be redone.
Do you install large-format tile?
Yes. Large-format porcelain is most of what we lay in showers and on floors. It needs a flat substrate and careful handling, which is where experience shows.
Get a free estimate for your bathroom project
Tell us a little about the job. We’ll call you back to set a time to come out, look at it with you and measure. The visit is free, and you get a written quote before any work starts.
We’ll get back to you within one business day.
- Monday to Friday
- 7:00 am to 5:00 pm
- Saturday and Sunday
- Closed
